Licensed & Insured · EPA / NYS DOL Certified · 24/7 Emergency Response (214) 316-7317
Asbestos Abatement

Asbestos Testing & Abatement You Can Document

From a single pipe elbow to a full building strip-out, ABBN surveys, contains, removes and disposes of asbestos-containing materials under NYS DOL and EPA protocols — with the filings and clearance results your inspector, lender or architect needs.

Request asbestos abatement

Tell us about the property and the concern. We confirm an inspection time — usually within 24 hours.

We use your details only to respond to this request — never sold or shared. See our Privacy Policy. Prefer to talk now? Call (214) 316-7317

Licensed & Certified Accredited Lab Analysis Testing + Abatement Under One Roof 20+ Years Experience

What asbestos abatement involves

Asbestos was used in pipe and boiler insulation, floor tile and mastic, roofing, siding, joint compound and textured ceilings well into the 1980s. Intact material is often safe; disturbed material releases fibers that stay airborne for hours. Abatement means surveying and sampling the suspect material, building sealed containment under negative air pressure, wetting and removing the material by hand, HEPA-vacuuming and wipe-cleaning the space, then verifying with air clearance testing before the barriers come down.

Signs you need asbestos abatement

  • Renovation or demolition in a building constructed before 1990
  • Crumbling white or grey wrap on basement pipes and boilers
  • 9x9 floor tiles or black mastic under newer flooring
  • Textured 'popcorn' ceilings being scraped or sanded
  • Damaged transite siding, roofing felt or shingles
  • A DOB, DEP or lender requirement for an ACP-5 filing
ABBN technicians removing asbestos material inside sealed containment

How our asbestos abatement works

  1. 1

    Survey and bulk sampling, analyzed by an accredited lab.

  2. 2

    Filings and notifications — ACP-5/ACP-7, DEP and DOB as required.

  3. 3

    Sealed containment, negative air machines and wet removal by licensed handlers.

  4. 4

    Air clearance testing, disposal manifests and a full documentation package.

Filings, manifests and clearance

Every project closes with the paperwork trail regulators ask for: pre-work notifications, licensed-handler records, daily air-monitoring logs, third-party clearance results and signed waste manifests showing the material reached an approved landfill. That package is what keeps a stop-work order from turning into a shutdown — and what your buyer's attorney will ask for at closing.

See our full process

Certifications & licenses

EPA Lead-Safe Certified Firm
NYS DOL Licensed Asbestos Contractor
NJ DCA Licensed
AIHA-Accredited Lab Analysis
OSHA 40-Hour Trained Crews
Fully Licensed, Bonded & Insured

Our process

1

Schedule

Call or send the form. We confirm an inspection window, usually within 24 hours.

2

Inspection & sampling

On-site assessment, moisture mapping, photos and lab samples collected.

3

Lab analysis

Accredited third-party lab analyzes samples and returns certified results.

4

Report & scope

You get a written report, guidance and a line-item scope of work — free of charge.

See the full process

Asbestos Abatement — common questions

In New York City, most permitted work in pre-1990 buildings requires an asbestos assessment and an ACP-5 filing before the DOB will issue the permit. Outside NYC, the requirement varies but lenders and general contractors usually ask for one anyway.

See all FAQs

Need asbestos abatement? Talk to a certified project manager.

Free on-site assessment and a written scope of work within 24 hours.

Call now Free quote